Holton Street, London
Future Building Solutions Ltd commissioned Lazenby to help transform this home designed by Paper House Project. This comprehensive refurbishment features Lazenby’s polished concrete throughout.Go Back
Project detail
Three days to install the 52m² of Basalt internal and external polished concrete floors.
Azure Grey pre-cast worktops with cast in sink (450mm x 400mm with drainer groves) all 100mm deep. The 1480mm x 650mm worktop was cantilevered from the wall with bracket fitted behind a false wall and steel plate to adjoining worktop.
Azure Grey splashbacks 20mm thick.
All images by Simon Maxwell Photography.
Project Owner
Paper House Project & Future Building Solutions Ltd
Project Location
Holton Street, E1 London
Product Used
Polished concrete floors, worktops with sink and step
Colour
Basalt polished concrete floor and Azure Grey pre-cast concrete
Visual / Textural Finish
Satin
Sector
Residential
Want more project details?
Get in Touch