Case Study
Wimbledon, London
10 Sahara sinks – singles and doubles – were cast at Lazenby’s Yeovil manufacturing centre, then carefully transported to site for install by the main contractor.Project detail
Each sink was mounted on purpose designed and built reinforced wooden vanity units. The sinks varied in weight from 50kg to 150kg and took 2 people to lift into position.