Silverleaf Bar, Devonshire Row
Lazenby worked with main contractors Verity Interiors to install this stunning Architop floor within the Whiskey Bar at this high end London Hotel.Project detail
Over 300 m2 of our Architop floor was poured over levels 3 & 4 of this London refurbishment project. The Architop was installed at 2mm thick over a cement board which had been laid by the main contractor. As the time scales on the project were extremely tight, Lazenby only had 3 weeks to prep, pour and protect the floor to ensure that other trades could access the area. Following the joinery and decorating work being completed, Lazenby returned to carry out a final clean, polish and seal of the floor ready for handover.